Infrastructure
Infrastructure
Rockingham Beach Foreshore Upgrade
Ertech was contracted to upgrade parts of the Rockingham Beach Foreshore Precinct including a grassed amphitheatre, a lookout point, and expanded Boardwalk.
Read moreInfrastructure
PIIOP 3 Structures and Project Management Services
Ertech delivered several projects as part of the Murray Irrigation PIIOP 3 project, focusing on upgrading larger infrastructure within the main canals of the network.
Read moreInfrastructure
URBNSURF Melbourne
Ertech was contracted to complete site establishment works for the URBNSURF Melbourne Facility, the first man-made surf facility in Australia.
Read moreInfrastructure
Murrumbidgee and Lowbidgee WHS Compliance Contracts
Ertech was awarded 2 contracts for the design and construction of weir and regulator elements for 2 valley areas.
Read moreInfrastructure
Cosgrove 3 Landfill
Ertech undertook all site preparation, clearing and earthworks for the facility to allow for the transition into a modern landfill site.
Read moreInfrastructure
Yule Source Upgrade and Supply Main
Ertech was contracted by Water Corporation to upgrade multiple mains as part of the Yule Supply Main distribution system between 2013 and 2017.
Read moreInfrastructure
Tyabb Reservoir Earthworks, Lining and Floating Cover
Ertech was contracted to upgrade the existing facility and divide the reservoir into two sizes. New pipework and valves were also installed to provide additional control.
Read moreInfrastructure
Mills Park Master Plan
Ertech redeveloped and rehabilitated Mills Park, a 24-hectare space with high levels of sport and passive recreational use.
Read moreInfrastructure
Perth Stadium Pre-construction Site Works
The Ertech Keller JV was formed to design and prepare key areas of the site in advance for the construction of the stadium. Works were completed in 2014.
Read more