Murumbidgee and Lowbidgee WHS Compliance

Project Overview

Ertech was awarded two contracts for the design and construction of weir and regulator elements for the two valley areas. These awards were a result of Water NSW identifying many Work, Health and Safety non-conformances in the valleys. These potential hazards include slips, trips and falls, environmental and physical hazards, static and mobile plant and equipment, manual handling and working at height hazards.

The Murrumbidgee Project included the design and construct elements of 10 weirs and regulators covering a 400km diameter footprint from Leeton in eastern NSW to Balranald Town in western NSW.

Fast Facts

  • ClientWater NSW
  • LocationMurumbidgee and Lowbidgee Valley Area's NSW
  • Year of construction 2019

Scope of works

The contract was for refurbishment and replacement works at each of the following locations:

  • Redbank Weir
  • Yanga Regulator No 102
  • Waugorah Regulator 100
  • Hartwood Weir
  • Hay Weir
  • Maude Weir
  • Tarabah Weir
  • Spillers Regulator
  • Tombullen Outlet
  • Gogeldrie Weir

The main scope of works included fabricating and installing new 18-meter-tall stairs towers to provide safe access to weir gantry systems.

Lowbidgee

The Lowbidgee Project included the design and construct elements of 16 weirs and regulators with the scope covering a 100km diameter footprint from Maude in eastern NSW to Balranald Town in western NSW. This contract was for the refurbishment or replacement works at the following locations:

  • Wynburn Escape Regulator
  • Wynburn Escape Middle A Regulator
  • Wynburn Escape Middle B Regulator
  • Glenn Avon Escape Regulator No.133
  • Baupie Escape No.134
  • Baupie Escape No.134A
  • Redbank Channel 116
  • Lake Maremley Regulator No120.
  • Redbank Weir Road Regulator No. 108
  • Redbank Weir Road Regulator No. 108A
  • Redbank Weir Road Regulator No. 109
  • Redbank Weir Road Regulator No. 110
  • Redbank Weir Road Regulator No. 111
  • Spitters Bank Regulator No. 107
  • Jindeena Bridge Regulator No. 122
  • Tala Escape Regulator No. 87