Morley Drive and Bath Road Roundabout Construction

Project Overview

Main Roads WA engaged Ertech to construct a new dual-lane roundabout at the intersection of Morley Drive and Bath Road. This important upgrade eases congestion, improves safety and enhances traffic flow for the 26,000 commuters who use this section of the road network daily.

As part of the works, access for cyclists and pedestrians will also be improved through the realignment of the existing shared path and the construction of median refuges on all three legs of the intersection.

This dual-lane roundabout construction includes vegetation clearing, earthworks, drainage, granular sub-base, FDA, seal, asphalt, signage, and line marking.

Fast Facts

  • Client Main Roads Western Australia
  • LocationMorley, WA
  • Year of Completion 2025

Scope of works

The scope of work included:

  • Construct a new dual-lane roundabout at the intersection of Morley Drive and Bath Road, incorporating reverse curves to reduce speeds on the approaches to Morley Drive
  • Close the Fitzgerald Street and Bath Road intersection due to its position relative to the roundabout, and replace it with a cul-de-sac
  • Convert the intersection of Woking Street and Bath Road to ‘Left-in/Left-out’ by installing a raised median on Bath Road
  • Extend Clandon Way to provide access to houses on Morley Drive
  • Upgrade shared paths for the extent of road reconstruction works, including tactile ground surface indicators (TGSIs)
  • Extend the existing 2.5m wide red asphalt shared path from Tonkin Highway to Bath Road, and construct 2.5m concrete paths in other areas
  • Modify driveways as required to suit new kerb lines and road levels
  • Modify and improve drainage to offset additional runoff from the increase in pavement area
  • Pavement markings and signage
  • Relocation of/adjustment of water, sewer and Optus services
  • Additional scope included an increase in power conduits