{"componentChunkName":"component---src-templates-post-js","path":"/dejv/","result":{"data":{"wordpressWpSettings":{"title":"Ertech","wordpressUrl":"https://wp.ertech.com.au","blogSlug":"news","date_format":"F j, Y"},"siteSettings":{"options":{"showAuthor":false,"customCss":""}},"wordpressPost":{"id":"d20ac633-f851-540f-9038-afe487fe6607","title":"Duratec Ertech Joint Venture (DEJV) Awarded a $281M Contract","slug":"dejv","path":"/dejv/","content":"<h3>Brighton Memorial Playing Fields, Brighton-Le-Sands</h3>\n<ul class=\"icon-grid\">\n<li style=\"list-style-type: none;\">\n<ul class=\"icon-grid\">\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Upgrade the full-sized sports fields from grass to synthetic turf;</li>\n<li>A new mid-sized grassed turf sports field;</li>\n<li>New amenities building;</li>\n<li>New playground facilities;</li>\n<li>Upgraded car park with increased capacity;</li>\n<li>Lighting around the sports fields and car park;</li>\n<li>Fencing, tree planting and landscaping.</li>\n<li>The project is due to start in August and will continue to mid-2021.</li>\n</ul>\n</li>\n</ul>\n</li>\n</ul>\n<h3>McCarthy Reserve / Ador Park Precinct, Rockdale</h3>\n<ul class=\"icon-grid\">\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Upgrade the full-sized sports field from grass to synthetic turf;</li>\n<li>A new mid-sized turf sports field;</li>\n<li>A new public vehicle access point and new car park with increased capacity;</li>\n<li>A new skate park;</li>\n<li>New playground facilities;</li>\n<li>New pedestrian bridge and an addition to the existing bridge;</li>\n<li>New pedestrian and cyclist shared path;</li>\n<li>Lighting around the sports fields, skate park and car park;</li>\n<li>A new amenities building with change rooms, kiosk and bathroom facilities and a new toilet block;</li>\n<li>Fencing, tree planting and landscaping.</li>\n</ul>\n</li>\n</ul>\n","excerpt":"<p>Brighton Memorial Playing Fields, Brighton-Le-Sands Upgrade the full-sized sports fields from grass to synt","wordpress_id":5941,"date":"2026-05-11T06:37:15.000Z","featured_media":{"source_url":"/wp-content/uploads/2026/04/cc11-web2-e1778482215892.png","localFile":{"childImageSharp":{"fluid":{"aspectRatio":1.5,"src":"/static/e7435b7c5cca3dd39e0fd4d729b0c325/b0a4a/cc11-web2.png","srcSet":"/static/e7435b7c5cca3dd39e0fd4d729b0c325/7db5f/cc11-web2.png 168w,\n/static/e7435b7c5cca3dd39e0fd4d729b0c325/a8d9e/cc11-web2.png 335w,\n/static/e7435b7c5cca3dd39e0fd4d729b0c325/b0a4a/cc11-web2.png 670w,\n/static/e7435b7c5cca3dd39e0fd4d729b0c325/22ab6/cc11-web2.png 1005w,\n/static/e7435b7c5cca3dd39e0fd4d729b0c325/4a0a7/cc11-web2.png 1340w,\n/static/e7435b7c5cca3dd39e0fd4d729b0c325/43dea/cc11-web2.png 1559w","sizes":"(max-width: 670px) 100vw, 670px"}}}},"acf":{"layout":[{"__typename":"WordPressAcf_postInformation","id":"d20ac633-f851-540f-9038-afe487fe66070layoutWordPressAcf_postInformation","bannerImage":{"source_url":"/wp-content/uploads/2026/04/cc11-web-e1778474756218.png","title":"cc11 web"},"postDescription":"The Duratec Ertech Joint Venture (DEJV), has been awarded a $281M contract for the infrastructure upgrades to support future submarine capability at HMAS Stirling on the Diamantina Wharf at Garden Island, WA."},{"__typename":"WordPressAcf_TwoColumn","heading":"","rows":[{"contentType":"text","image":null,"content":"<p><a class=\"MyWXPLFXbHRaqQriqaPgQPOcjVlyKblEigexMA \" tabindex=\"0\" href=\"https://www.linkedin.com/company/ertech/\" target=\"_self\" data-test-app-aware-link=\"\">Ertech</a> is pleased to advise that its 50:50 joint venture with <a class=\"MyWXPLFXbHRaqQriqaPgQPOcjVlyKblEigexMA \" tabindex=\"0\" href=\"https://www.linkedin.com/company/duratec/\" target=\"_self\" data-test-app-aware-link=\"\">Duratec</a>, the Duratec Ertech Joint Venture (DEJV),  has been awarded a $281M contract for the infrastructure upgrades to support future submarine capability at HMAS Stirling on the Diamantina Wharf at Garden Island, Western Australia.</p>\n<p>Early on-site works, awarded under a separate contract valued at $9.2m, commenced on site in January 2026. This was undertaken alongside the early procurement of ~$5m of long lead items, while contract design neared 100% completion and final design approval was granted.</p>\n<p>This award of the main works contract, with a duration of approximately 24 months, marks the conclusion of the ECI Planning Phase, and the DEJV will now transition into project delivery, taking the total contract value for the works to just under $300m.</p>\n<p>The above project relates to major infrastructure upgrades in anticipation of the arrival of the rotational force from the United States and the United Kingdom under the AUKUS partnership.</p>\n<p>Further information <a href=\"https://www.linkedin.com/posts/wa-business-news_duratec-ertech-wins-281m-hmas-stirling-works-activity-7450039100944064512-E2_o?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAAZRAh4BywxPtgVRXzuPcFiQQvphd3ojfLk\">here</a>.</p>\n","form":{"formId":"","formContent":""},"iconGrid":{"heading":"","Grid":[]}},{"contentType":"image","image":{"source_url":"/wp-content/uploads/2026/04/cc11-web3.png","localFile":{"publicURL":"/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/cc11-web3.png","childImageSharp":{"fluid":{"aspectRatio":1.5060240963855422,"src":"/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/53f65/cc11-web3.png","srcSet":"/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/a90ce/cc11-web3.png 125w,\n/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/002c1/cc11-web3.png 250w,\n/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/53f65/cc11-web3.png 500w,\n/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/f26e3/cc11-web3.png 750w,\n/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/5d2c5/cc11-web3.png 1000w,\n/static/9f6c8ae61fbb5ab2c7dc2332ee47e1a0/de624/cc11-web3.png 1559w","sizes":"(max-width: 500px) 100vw, 500px"}}}},"content":"<p>The Spoilbank Marina located east of the Port of Port Hedland shipping channel, is being developed by the PPA for recreational boat use. Ertech has been engaged to deliver the civil and landscaping work (Package 4) for the marina, which includes:</p>\n<h3><strong>Scope of Works</strong></h3>\n<ul>\n<li>Detailed earthworks including cut and fill to achieve design subgrade levels.</li>\n<li>Installing utilities, services, and infrastructure including gravity sewer, potable water main, fire water system, reticulation, electrical distribution network (switchboards and reticulation), CCTV and NBN.</li>\n<li>Constructing roads, carparks, stormwater infrastructure, concrete paths, kerb, and medians.</li>\n<li>Constructing a public amenities building</li>\n<li>Fabricating and installing shade structures and other marina infrastructure</li>\n<li>Installing street furniture</li>\n<li>Hard and soft landscaping, including tree planting.</li>\n<li>Installing signage and pavement markings.</li>\n<li>Final testing and commissioning.</li>\n</ul>\n<p>Ertech will self-perform the electrical work on the contract.</p>\n","form":{"formId":"","formContent":""},"iconGrid":{"heading":"","Grid":[]}}],"columnSpacing":"large","wrapWidth":"large","fancyBorder":"none","columnAlignment":"top"}]},"categories":[{"name":"Project Win","slug":"project-win","path":"/category/project-win/"}],"author":{"name":"Francy Velasco","slug":"francy","path":"/author/francy/","avatar_urls":{"wordpress_48":"https://secure.gravatar.com/avatar/8b45619cdb4f5465ef53f8d3928abae5cd61732548b96b98dcf39f65337d2c38?s=48&d=mm&r=g"}},"yoast":{"metaTitle":"","metaDescription":"Project Win DEJV: Infrastructure upgrades to support future submarine capability at HMAS Stirling, Diamantina Wharf at Garden Island, WA.","meta_robots_noindex":"","meta_robots_nofollow":"","opengraph_image":{"source_url":""},"twitter_image":{"source_url":""}}}},"pageContext":{"id":"d20ac633-f851-540f-9038-afe487fe6607","noindex":false}},"staticQueryHashes":["1486285561","1486285561","187366861","2568767299","3041280590","304281037","3138431152","3602273234","78298652","861822871"]}