Geosynthetic Linings

  • Boddington Gold Mine (300,000m3 of 300mm clay liner excavated and compacted, 25km of 160dia Draincoil for underdrainage system, 750,000m2 of 1.5mm HDPE Liner)
  • Ravensthorpe Nickel Operation (1,100,000m2 of 1.5mm HDPE liner)
  • Red Hill (clay lining to 80,000m2 of walls and floors, 8 layer lining system)
Geosynthetic Linings