Albany Ring Road Stage 1
Approximately 6km of single lane carriageway linking Albany Highway to Chester Pass Road.
- View PDF

Angle Vale Road Stormwater Upgrade
Ertech’s contract included the supply and installation of large diameter reinforced concrete stormwater pipes and pits on Angle Vale Road...
- View PDF

Anzac Drive Industrial Estate Stage 1
Industrial subdivision including earthworks, roadworks, drainage and services.
- View PDF

Aslett Drive Extension
The project involved construction of 4.5km of new road including all underground services to access the new Kalgoorlie Golf Resort and provide access to the Greenview subdivision.
- View PDF

Barrow Island Projects
The series of projects undertaken by Ertech involved rehabilitation and maintenance of facilities such as lease pads, access roads and the airport runway on Barrow Island.
- View PDF
Belgrave Oval Reconstruction
Reconstruction of oval at Belgrave Recreation Reserve
- View PDF

Boddington Gold Mine Tailings Storage Facility
The project involved converting an existing water storage dam into the first stage of a 750,000m2 HDPE Lined Tailings Storage Facility.
- View PDF

Burns Beach Estate
Ertech have been involved in this project since commencement and have worked closely with Peet Ltd throughout the duration of the project.
- View PDF
Carramar Golf Course Estate
Ertech’s work at Carramar is a demonstration of a long term, mutually beneficial relationship with its client, Peet Ltd.
- View PDF

Catchment Lake Extension at Worsley Alumina
The contract involved the excavation and removal of 2,000,000m3 of material to spoil to increase the capacity of the plant’s water catchment lake.
- View PDF

CEP Marshalling Yards Extension
Working near live rail to construct the extension to Marshalling Yard for BHP Billiton, Nelson Point, Port Hedland.
- View PDF

Collier Drive Subdivision, South Hedland
Approximately 150 lot subdivision in South Hedland.
- View PDF

Construction of Settlers Run Golf Course, Victoria
The construction of Settlers Run Golf Course was the first in conjunction with world renowned golf course designer Greg Norman.
- View PDF

Demarchi Road Subdivision, South Hedland
The principal statistics of the contract are as follows:
110 residential lots 91,000m2 clearing 91,000m2 topsoil stripping 125,000m3 imported fill 13,210m2 roadworks 2,443m sewer 1,103m stormwater 1,870m water and power - View PDF

Edith Cowan University Churchlands Redevelopment
This project involved the redevelopment of the Churchlands campus of Edith Cowan University and included the full demolition and remediation of the University.
- View PDF

Emily Ann TSF 1 Lift 4 and TSF2 Lift 1
This project involved a 2.4m high Tailings Dam Lift to the existing TSF 1 as well as the construction of the new TSF 2.
- View PDF

Emily Ann TSF 1 Stage 3 Embankment Raise
The project involved a 2m high tailings dam lift with approximately 100,000m3 of clay to be placed in a 6 week period.
- View PDF

Fimiston Asphalt Project Stage 2
Repairs to existing areas within the Fimiston plant in Kalgoorlie.
- View PDF

Findon Court, Point Cook
This contract is for the construction of road, drainage, sewer and water reticulation works for a 34 lot subdivision.
- View PDF

Galilee Wetland and Retention Basin Construction
Ertech’s contract included the construction of a wetland and retention basin for Galilee Catholic School.
- View PDF

Golden Grove Tailings Dam Wall
The contract involved a 2.4m high tailings dam lift with approximately 115,000m3 of clay to be placed in a 6 week period.
- View PDF

Golden Grove TSF 2 Stage 5 Raise
This project involved a 2m high Tailings Dam Lift with approximately 95,000m3of clay placement.
- View PDF

Gove Pond 3 Capping
This contract was constructed under a tight time schedule with difficult conditions, where isolation and the logistics of transport of materials became a key factor.
- View PDF

Henley Golf Course Construction at Heritage Golf and Country Club
The Tony Cashmore designed Henley project was the second course of the Heritage Golf Club built around an up-market residential living complex.
- View PDF

Honeymoon Uranium Civil and Concrete Works
Ertech’s contract included the civil and concrete works for the Honeymoon Uranium Project.
- View PDF

Hopetoun Infill Sewer & Wastewater Treatment Plant
As part of Ertech’s strong presence in this region, we successfully completed this project which utilised a range of Ertech’s skills.
- View PDF

Jabiru Loop Subdivision, South Hedland
Approximately 24 lot subdivision in South Hedland.
- View PDF

Joondalup Central Park
This project consisted of parkland including earthworks, lined lake, elevated timber walkway and automated reticulation.
- View PDF
Lake Raeside Road & Bridge Construction
Approximately 7.78km of single lane carriageway and a 120m long six span composite bridge (steel beams and concrete bridge deck).
- View PDF

Lakeside Kununurra Stage 5 & 5A
Lakeside Kununurra Stage 5 incorporating over 50 residential lots was awarded and commenced in June 2009.
- View PDF

McLaren Vale/McLaren Flat Water Supply Upgrade
Ertech’s contract included the construction of 850m of 250 diameter DICL water main on Tatachilla Road in McLaren Vale.
- View PDF

Mt Barker Bypass Road
The contract involved the construction of 4.7km of single lane carriageway bypassing the town centre of Mount Barker with associated intersections, slip lanes, a major roundabout on Albany Highway and extensive traffic management.
- View PDF
Murrin Murrin Village & Plant Roadworks and Drainage
Repairs to existing pavement including pothole repairs, pavement reconstruction and construction of new pavements, including seal and asphalt.
- View PDF

NAWMA Stage 2 Landfill Cell Liner & Leachate Collection System
NAWMA Stage 2 Landfill Cell Liner & Leachate Collection System
- View PDF

Newhaven Estate
Newhaven Estate is located in Piara Waters, WA with Ertech involved in all construction since commencement.
- View PDF

Olympic Dam Evaporation Pond 2 Lift
The construction of Evaporation Pond 2 Lift at Olympic Dam
- View PDF

Olympic Dam Evaporation Pond 5
The construction of Evaporation Pond 5 at Olympic Dam
- View PDF

Perth Airport Aprons
The project involved construction of a 210,000m2 aircraft apron for the Perth Airport, Regional Terminal (Terminal WA).
- View PDF

Ravensthorpe Nickel Mine
Since commencement in Ravensthorpe in 2004, Ertech have been heavily involved in the development of the minesite’s infrastructure over a range of disciplines.
- View PDF

Ravensthorpe Nickel Mine - Permanent Village
As part of our involvement in the Ravensthorpe Nickel Mine development, Ertech undertook the expansion of the Ravensthorpe Construction Camp for an additional 1,500 rooms.
- View PDF

Ravensthorpe Nickel Mine Refinery Roadworks and Services
Ertech’s contract included Plant Site Works, Camp Extensions Stage 2-5 and Tailings and Washwater Lines.
- View PDF

Red Hill Waste Management Facility Landfill and Leachate Pond Construction
This contract comprised the construction of a new Class III cell to contain 1,100,000m3 of commercial and municipal waste and a new Class IV cell to contain 300,000m3 of low hazard contaminated soil.
- View PDF

Red Hill Waste Management Facility Landfill and Leachate Pond Construction
This contract comprised the construction of a new Class III cell to contain 1,100,000m3 of commercial and municipal waste and a new Class IV cell to contain 300,000m3 of low hazard contaminated soil.
- View PDF

Royal Queensland Golf Course
The Michael Clayton Golf Design project was instigated through the Queensland government as they required some of the golf course land to put a second major bridge over the Brisbane River.
- View PDF

Seawater Pipeline, Transfer Pond and Pumping Station at Ravensthorpe Nickel Mine
The pipeline consisted of...
- View PDF

Tamala Park Landfill Stage 2A and 2B North
Tamala Park is the main refuse site for the northern suburbs in Perth.
- View PDF

The Outlook Joondalup
The Outlook is situated at the Joondalup Country Club.
- View PDF

Traine, Acacia & Cone Subdivision, South Hedland
This development was constructed in four stages in South Hedland.