Marandoo Accommodation Village
Category: Resource Infrastructure
View projectThe Marandoo Mine Phase 2 Project (MMP2) is part of Rio Tinto’s iron ore mine expansion.
The project involves the construction of a 902 man accommodation village and ancillary buildings - View PDF
Marandoo Dewatering Pipeline
Category: Pipelines
View projectThe Marandoo Mine Phase 2 Project (MMP2) is part of Rio Tinto’s iron ore mine expansion.
- View PDF
NVIRP Channel Lining
Category: Geosynthetics Linings
View projectThis project involved the remodeling and lining of 8km of irrigation channel with HDPE to reduce water losses in the irrigation system.
- View PDF
Ravensthorpe Seawater Pipeline
Category: Pipelines
View projectContract included excavation, laying and backfill of 39km of high pressure pipeline to move water from the transfer pond and pump station at Mason Bay to the desalination plant within the process plant
- View PDF
RAAF Pearce C17 Taxiway Upgrade
Category: Roadworks
View projectThe contract involved the widening of the existing taxiway whilst maintaining full RAAF base airport
- View PDF
Ord Irrigation Expansion Camp Forward Works
Category: Earthworks
View projectLandcorp has awarded a $3.1million contract to Ertech Pty Ltd to undertake site works on the workers' accommodation village at Kununurra as part of the Ord-east Kimberley expansion Project. The village will be able to house up to 250 employees and contractors.
- View PDF
Newman Water Supply Upgrade Phase 2
Category: Resource Infrastructure
View projectThe contract was to provide an increased capacity and more reliable
process water supply to the Mt. Whaleback and Newman Hub operations - View PDF
Newman Water Supply Upgrade
Category: Pipelines
View projectThe contract was to provide an increased capacity and more reliable
process water supply to the Mt. Whaleback and Newman Hub operations.
- View PDF
Mermaid Marine - Onshore Works
Category: Resource Infrastructure
View projectConstruction of 50,000m2 of marine load out pavement areas and associated services and pipework including rock armour walls
- View PDF
Mermaid Marine - Marine Works
Category: Resource Infrastructure
View projectConstruction of 5,000m2 of Marine loadout Pavement areas and 1500m3 of Structural Concrete Barge Berth and associated services
- View PDF
Devil Creek Camp Extension
Category: Resource Infrastructure
View projectThe Devil Creek Development Project – 100 Man Camp Extension
- View PDF
Cliffs Nickel Project
Category: Resource Infrastructure
View projectThe Cliff Nickel Project is an underground nickel mine close to the Mount Keith Mine some 400km north of Kalgoorlie owned and operated by BHP Billiton Nickel West.
Ertech were contracted to provide the civil infrastructure facilities while the underground mine was being developed. The works consisted of 7.0km of sealed and asphalted roads, drainage works, earthworks to the extension of camp facilities and HDPE lined ponds for waste materials. - View PDF
Caroline Springs Wetlands
Category: Earthworks
View projectThe works consist of the construction of Wetlands at Caroline Springs made up of 3 Bio-Retention Basins and storm water drainage.
- View PDF
Utah Point Berth Project
Category: Resource Infrastructure
View projectConstruction of stockyard for ship-loading facilities, which is an upgrade to the existing Port Hedland Port.
- View PDF
Mt Barker Bypass Road
Category: Roadworks
View projectThe contract involved the construction of 4.7km of single lane carriageway bypassing the town centre of Mount Barker with associated intersections, slip lanes, a major roundabout on Albany Highway and extensive traffic management.
- View PDF
Albany Ring Road Stage 1
Category: Roadworks
View projectApproximately 6km of single lane carriageway linking Albany Highway to Chester Pass Road.
- View PDF
Boddington Gold Mine Tailings Storage Facility
Category: Geosynthetics Linings
View projectThe project involved converting an existing water storage dam into the first stage of a 750,000m2 HDPE Lined Tailings Storage Facility.
- View PDF
Barrow Island Projects
Category: Earthworks
View projectThe series of projects undertaken by Ertech involved rehabilitation and maintenance of facilities such as lease pads, access roads and the airport runway on Barrow Island.
- View PDF
Edith Cowan University Churchlands Redevelopment
Category: Land Development
View projectThis project involved the redevelopment of the Churchlands campus of Edith Cowan University and included the full demolition and remediation of the University.
- View PDF
Honeymoon Uranium Civil and Concrete Works
Category: Resource Infrastructure
View projectErtech’s contract included the civil and concrete works for the Honeymoon Uranium Project.
- View PDF
Hopetoun Infill Sewer & Wastewater Treatment Plant
Category: Pipelines
View projectAs part of Ertech’s strong presence in this region, we successfully completed this project which utilised a range of Ertech’s skills.
- View PDF
Lake Raeside Road & Bridge Construction
Category: Roadworks
View projectApproximately 7.78km of single lane carriageway and a 120m long six span composite bridge (steel beams and concrete bridge deck).
- View PDF
Newhaven Estate
Category: Land Development
View projectNewhaven Estate is located in Piara Waters, WA with Ertech involved in all construction since commencement.
- View PDF
Ravensthorpe Nickel Mine
Category: Resource Infrastructure
View projectSince commencement in Ravensthorpe in 2004, Ertech have been heavily involved in the development of the minesite’s infrastructure over a range of disciplines.
- View PDF
Red Hill Waste Management Facility Landfill and Leachate Pond Construction
Category: Geosynthetics Linings
View projectThis contract comprised the construction of a new Class III cell to contain 1,100,000m3 of commercial and municipal waste and a new Class IV cell to contain 300,000m3 of low hazard contaminated soil.
- View PDF
Perth Airport Aprons
Category: Roadworks
View projectThe project involved construction of a 210,000m2 aircraft apron for the Perth Airport, Regional Terminal (Terminal WA).
- View PDF
Olympic Dam Evaporation Pond 5
Category: Geosynthetics Linings
View projectThe construction of Evaporation Pond 5 at Olympic Dam
- View PDF
Belgrave Oval Reconstruction
Category: Earthworks
View projectReconstruction of oval at Belgrave Recreation Reserve
- View PDF
Olympic Dam Evaporation Pond 2 Lift
Category: Geosynthetics Linings
View projectThe construction of Evaporation Pond 2 Lift at Olympic Dam
- View PDF
NAWMA Stage 2 Landfill Cell Liner & Leachate Collection System
Category: Geosynthetics Linings
View projectNAWMA Stage 2 Landfill Cell Liner & Leachate Collection System
- View PDF
Connolly Drive Duplication
Category: Roadworks
View projectThis contract was for the duplication of 1.7km of Connolly Drive from Burns Beach Road to McNaughton Crescent.
- View PDF
Gorgon Project
Category: Resource Infrastructure
View projectErtech are constructing the Site Development and WAPET Landing contract for the Gorgon Project at Barrow Island.