Description
The contract was to provide an increased capacity and more reliable
process water supply to the Mt. Whaleback and Newman Hub operations.
Ertech’s scope of works included:
• Clearing of 280,000m2 of working corridor.
• Supply and weld 4,800m of 450mmØ Polyethylene pipe.
• Supply and weld 10,000m of 630mmØ Polyethylene pipe.
• Trenching (using a Vermeer chain trenching machine), lay and backfill – 13,450m.
• Installation of valves, fittings and pipe specials.
• Remedial work to water storage tank (61mØ by 7.1m height), including a structure controlled survey and re-lining.
• Installation of pumps and electrical control devices
• Road thrust boring – two locations of 20m each.
• Traffic control management.
• Location of services by means of “potholing” machine.

INNOVATION - use of Fast Fusion Welding Machine

 